Final Drive Rebuild

Final drive rebuilds to OEM backlash and preload specification. Planetary gear set and ring gear inspection, bearing and seal replacement, and wheel and brake interface recondition, tested for rotation, preload, and leaks.

Every final drive rebuild is stripped, assessed, and rebuilt to specification, then tested and certified before it returns to service.

OEM standard
OEM
Testing
Rotation / preload and leak test
Warranty
2000-hour warranty on applicable components

Rebuild your own core, fit a reman exchange unit to minimise downtime, or have spares supplied. We will quote price, turnaround, and core-return terms.

Start a parts enquiry

Final Drive Rebuild - FAQ

Yes. VRM Mining rebuilds the final drive rebuild to OEM standard, issued with a rotation / preload and leak test, and backed by a 2000-hour warranty on applicable components.

Rebuild your final drive rebuild to OEM standard

Request an assessment and we will scope the work with you.